APPLICATION CYCLE
■ Application of the polyethylene perimeter adhesive strip dBred LF5 only vertically.
■ Glue application with cogged trowel of 6 - 8 mm according with application layer’s planarity.
■ Laying of dBred mat.
■ Passage with overload roll of 25 kg with the aim to allow a perfect adhesion between glue and the mat.
■ Sealing of the dBred mat junctions with silicone.
■ Wait for the grip of the glue.
■ Apply the glue on the mat with a 10 mm toothed spatula (curved toothing) in order to obtain the total adhesion of the flooring covering.
■ Application of the ceramic coating with spacings of variable width according to the coating’s format. It is recommended to realize spacings of at least 3 mm for coatings with dimensions up to 60 cm and surfaces of no more than 20 m2; and spacings of 5 mm for coatings with the greater side of 60 cm and/or surfaces over 20 m2.
■ Fill in the joints (traditional method).
■ Apply the baseboard.